Specializing In:
Projects
< Back to projects
Sunrise Park Pressure Treated Dock & Seawall Reconstruction
Type: Miscellaneous Projects
Project Manager: Mark A. Hampton, P.E.
Owner: City of Holly Hill
Demolition and reconstruction of 240± feet concrete seawall with handrails and reconstruction of various docks with handrails. Modification of existing seawalls and replacement of handrails. The seawall was constructed using reinforced concrete sheet piles with "deadmen" tiebacks and a concrete top cap. A survey was made of the park facility including the existing seawall location to obtain a State dredge and fill permit exemption.