Central Recharge Area Wellfield Expansion Phase III
Type: Potable Water
Project Manager: Brad T. Blais, P.E.
Owner: City of Port Orange
Construction of six (6) new potable supply wells (nos. C22, C23, C24, C25, C26 and C27) each equipped with 30 hp pumps rated 350 gpm at 150 ft TDH. Each well was enclosed in a modular concrete building with security alarms. Raw water piping included approximately 3,625 feet of sixteen inch water main, 2,900 feet of twenty inch water main, 1,685 feet of twenty four inch water main and appurtenances. Three 215 KW generators (w/ 500 gal. diesel storage tanks) were installed to provide emergency power for the 6 new wells and three existing wells.