Tymber Creek & Hand Avenue Force Main
Type: Wastewater
Project Manager: David A. King, P.E.
Owner: City of Ormond Beach
The scope of engineering services included the survey, engineering design, permitting, bidding and construction administrative services required for the construction of 8” and 12” force mains. The Tymber Creek Road force main was extended from the City’s existing force main located at Saddlers Run and continue south along Tymber Creek to SR 40 where it will connect to an existing 10” force main. The Hand Avenue force main connects to the end of the existing 12” force main adjacent to Aberdeen and continue west along Hand to Williamson Blvd. where it connects into an existing force main. The existing 12” force main on Clyde Morris Boulevard. at SR 40 will be extended across SR 40 to connect into the existing 18” gravity sewer.